Phase 1 (2005) Phase 2 (2006) Phase 3 (2015) New construction, renovations, and expansion/completion of final phase of the Convention Spaces. Approximately 90,000 SF addition to previous phases. $50MM worth built in an extremely challenging location on the river in downtown and within one calendar year. This was the final step in completing max square footage for Spokane to compete on the national convention space market.
Garco Construction, Inc.
Exterior Framing, Sheathing,Weather Resistive Barriers, CI Insulation, Interior Framing, Insulation, Drywall, Fire Resisitive Joints, Sound Isolation, Acoustical Ceilings, Linear Metal Ceilings, Acoustical Wall Panels, Wood Grille Systems, EIFS
Phase 1 (2005) Phase 2 (2006) Phase 3 (2015) New construction, renovations, and expansion/completion of final phase of the Convention Spaces. Approximately 90,000 SF addition to previous phases. $50MM worth built in an extremely challenging location on the river in downtown and within one calendar year. This was the final step in completing max square footage for Spokane to compete on the national convention space market.