El Centro Repowering Unit #3

Imperial Irrigation District (IID) | El Centro, CA | September 2012

Located in a remote area near the U.S./Mexico border, the PCI team overcame extreme weather conditions including wind and heat on this project.

  • ARB, Inc.

  • Power: Natural Gas

  • Los Angeles Industrial

  • Supply/install insulation & jacketing materials for all piping and equipment on a new Siemens 2 on 1 HRSG system within an existing power plant | Asbestos abatement on existing facilities